HALTEC BASIC temporary buildings

fully insulated

Fully insulated halls for storing temperature-sensitive goods or heated as temporary assembly or production buildings.

Complete all-round protection for higher demands on cold and heat insulation

HALTEC BASIC-protection class 5 | fully insulated

  • Protection
    from above
  • Protection
    from the side
  • Protection against
    condensation
  • Full thermal
    protection
Delivery Time from 6-8 weeks*
Assembly Time approx. 6-7 days*

* Delivery and assembly times vary seasonally and depending on complexity. A hall measuring 15 x 30 metres in standard design was assumed as a reference for the assembly time.

Cladding variants

Roof cladding:

Sandwich panels

Wall cladding:

Sandwich panels

Insulated temporary buildings are completely clad with 60 mm thick sandwich panels. They offer real full thermal protection.

Equipment options      View references


REQUEST NOW

Your offer free of charge and without obligation.

 


Examples of fully insulated temporary buildings in our references

Would you like to contact us directly?
Arrange an appointment with us.

+49 2372 9497-135
export@haltec.net

FAQFrequently asked questions about fully insulated temporary buildings

Protection class 5 | fully insulated is clad with 60 mm thick sandwich panels. These panels have a thermal transmittance value of up to U = 0.38 W/m² K. This corresponds to simple insulation that keeps the heat outside in summer and the heat inside in winter. Nevertheless, temporary buildings cannot be compared with highly insulated buildings due to their temporary nature. If you are planning a permanent, energy-optimised hall, our SELECT steel buildings are suitable for this purpose.


HALTEC offers you mobile or stationary heaters to keep our BASIC temporary buildings at a pleasant temperature. Depending on requirements, heaters can be installed both inside and outside the halls to save space. We will be happy to advise you.


Despite the thermal insulation, temporary buildings are only suitable for this purpose to a limited extent or temporarily due to their optimisation for temporary use. The Building Energy Act must be observed. This allows low insulation for tents and buildings with a planned service life of up to two years. The Workplace Directive must also be observed. According to this, specified temperatures must be reached for certain activities. The simpler the insulation, the higher the energy requirement to achieve the prescribed temperatures.

If you need a permanent production building, we recommend a HALTEC SELECT steel building. This is completely customised to your individual requirements.



HALTEC. Secure space gain with hall systems.

We are an owner-managed company with our own production facilities in Germany. Continuous investment in our quality management guarantees product reliability and smooth processes in accordance with certified standards.
The win-win for your space gain: systematised project processes, systematised hall construction, systematised solution finding.

Systematisation as the solution. Our DNA