HALTEC BASIC temporary buildings

roofed

Simple canopies for dry loading, roofed storage areas and protection of goods from direct sun, rain or hail.

Simple protection from above

HALTEC BASIC protection class 1 | roofed

  • Protection from
    from above
  • Protection from
    the side
  • Protection against
    condensation
  • Protection
    from frost
Delivery Time from 1-2 weeks*
Assembly Time approx. 1-2 days*

* Delivery and assembly times vary seasonally and depending on complexity. A hall measuring 15 x 30 metres in standard design was assumed as a reference for the assembly time.

Cladding variants

Roof cladding:

PVC tarpaulin

Wall cladding:

-

Canopies with translucent PVC tarpaulins are the simplest variant in the HALTEC BASIC range.

Equipment options      View references


REQUEST NOW

Your offer free of charge and without obligation.


Roof cladding:

Trapezoidal sheet metal

Wall cladding:

-

Canopies with trapezoidal sheet metal cladding are visually appealing and have advantages in terms of fire protection requirements due to the hard roofing.

Equipment options       View references


REQUEST NOW

Your offer free of charge and without obligation.


Examples of canopies in our reference halls

Would you like to contact us directly?
Arrange an appointment with us.

+49 2372 9497-135
export@haltec.net

FAQFrequently asked questions about simple canopies

The heavy fabric tarpaulins used are extremely robust at 650 g/m² and have proven themselves in constant use for decades. Depending on the weather and stress, it can be expected to last for many years. If a tarpaulin is damaged in the rough and tumble of everyday work, it can be easily repaired on site or simply replaced.


Yes, that is possible. With HALTEC, you retain full flexibility. If you decide afterwards that you still want to clad the side walls of your hall, please contact us. Our space gain experts will be happy to provide you with a suitable offer.


PVC tarpaulin is the first choice due to its more favourable prices and faster installation. However, if there are fire protection requirements, e.g. because the canopy is to be installed close to an existing building, trapezoidal sheet metal is an equally good, even though slightly more expensive, alternative.



HALTEC. Secure space gain with hall systems.

We are an owner-managed company with our own production facilities in Germany. Continuous investment in our quality management guarantees product reliability and smooth processes in accordance with certified standards.
The win-win for your space gain: systematised project processes, systematised hall construction, systematised solution finding.

Systematisation as the solution. Our DNA