SELECT Reference 007

Auto repair building for a GTÜ test centre

As business grew, the old premises of the motor vehicle expert Karri Klug became too small. He was looking for his own auto repair building. HALTEC quickly turned out to be the perfect realisation partner and planned the hall exactly according to the customer's needs.

Space gain
239 m²

Width
15.20 m

Length
15.70 m

Side height
6.25 m

Ridge height
7.60 m

Snow load
1.06 kN/m²

General inspections, safety checks, maintenance and other work on vehicles of all kinds are carried out in the GTÜ test centre's new SELECT steel hall. The side height of 6.25 metres and the four large industrial sectional gates ensure that even large vehicles can easily drive into the hall for inspection. The numerous windows let in plenty of daylight and ensure natural lighting. Glass doors and large shop windows in the entrance area round off the professional look.

In order to use the new HALTEC hall in a more efficient way , the client wanted a second floor to be installed. HALTEC already took this into account in the structural analysis and carried out the steel construction for this. The extension was then carried out on-site. During the construction of the steel hall, punctual delivery and proper and professional assembly were just two of the many requirements of the satisfied client. The professional and personalised support provided by HALTEC during the construction process was also highly appreciated by the customer. Karri Klug was so satisfied with HALTEC that he decided to purchase a second auto repair building.

Reference images and details

Optimally equipped

The 230 m² steel hall with a saddle roof has a large workshop area and offices.

Efficient working

Large windows in the gates and walls create bright workspaces.

Easy access to the hall

The high industrial sectional gates also allow larger vehicles to enter.

Attractive hall design

Microlined sandwich panels with hidden fixings give the hall a special look.

Representative main entrance

Large shop windows and glazed doors adorn the entrance area of the HALTEC hall.

Sufficient daylight

Horizontal rows of windows with a window sill at the bottom provide plenty of daylight.

Separate work areas

For offices and administration, the steel construction for a false ceiling was considered by HALTEC.

These references might also interest you

Haltec Select
Steel Buildings
Customised
Efficient
Permanent

Modular SELECT steel buildings offer permanent space gain. Customised planning and production as well as a wide range of equipment details enable individuality and personal design.

Discover the hall system