BASIC Reference 113
Temporary building with transition to an existing building
Protection class 4 | partly insulated. A customer from Poland needed a new hall for warehousing his goods. The special requirement: the warehouse was to be connected directly to the existing building. HALTEC had the perfect solution!
Goods and supplies from a large Polish spa hotel are stored in the warehouse. To ensure that the stored goods are neither too hot nor too cold, sandwich panels were installed as wall cladding. Translucent PVC tarpaulins have been installed in the roof, ensuring that the hall is bright enough during the day even without artificial light. The floor of the hall was sealed with a bitumen membrane to prevent draughts, moisture and vermin.
Perfectly connected
A special highlight is the connection between the warehouse and the existing building. This was achieved via a five metre wide and equally high lock. This allows goods to be transported from one building to the other in a protected manner.
Reference images and details
Lots of space gain
With the new HALTEC BASIC temporary building, the customer has gained over 2,300 m² of storage space.
Plenty of natural daylight
Translucent roof tarpaulins provide daylight-like conditions and save energy costs.
Large and safe access points
The large electric roller shutter gate and the adjacent escape and pedestrian door ensure the safe movement of goods and people.
BASIC Reference 113