BASIC Reference 122
Storage tent for rent for a Franconian family business
Protection class 3 | condensation-protected. DGS Drahtgestricke GmbH from Pleinfeld needed a temporary interim storage facility to protect goods ready for despatch. HALTEC was able to fulfil all the client's requirements with a rented marquee hall and create the urgently needed space gain in a very short time.
The HALTEC rental concept offered Managing Director Benjamin Schatz the perfect alternative to buying a hall. Thanks to the attractive monthly conditions, his company does not have to take any investment risk and retains the opportunity to utilise its budget elsewhere. At the end of the lease, the customer is also free to decide whether to return the hall, extend the lease or purchase it.
Cost-effective, flexible and sustainable
Another advantage of HALTEC temporary buildings: Thanks to the anchoring with ground pegs, no expensive foundation work is required. In addition, the hall can be dismantled almost without leaving any residue. This is not only easy on the wallet, but also on the ground on your own company premises.
Thanks to the modular design and the large HALTEC rental pool, the hall was realised in a very short time. The HALTEC fitters were on site around two weeks after the order was placed and erected the hall in just one and a half days.
We made a conscious decision to rent the storage tent for a year, because after that time we can decide for ourselves whether we want to return the tent, continue to rent it, or buy it.
Benjamin Schatz, Managing Director | DGS Drahtgestricke GmbH
Reference images and details
Additional temporary storage space
With the HALTEC temporary building for rent, the customer achieved additional storage space in a very short time without the high investment required for a purchase.
Light and dry
The translucent tarpaulin roof not only ensures a bright hall interior, but also provides protection against dripping condensation.
Maintenance-free doors
Goods are stored and retrieved via the manually operated tarpaulin gates in the length and gable wall.
Controlled water drainage
The additionally installed box gutter ensures controlled drainage of rainwater.
Well advised. HALTEC.
Building a hall raises many questions. Our online guide has detailed answers for you.
Find out how you can erect temporary buildings without foundations using soil nails. What you need to consider when obtaining approval for temporary buildings and which types of foundations are suitable if the temporary building is to be anchored with heavy-duty anchors. We also explain how temporary buildings can be moved on rails or attached without anchoring using ballast only.
BASIC Reference 122