BASIC Reference 149

Temporary warehouse for a sheet metal specialist

Protection class 3 | condensation-protected. With a rented hall from HALTEC, the required storage space was created in the shortest possible time. This temporary building serves as a transitional solution for a sheet metal processing company until the actual new building is completed.

Space gain
700 m²

Width
20.00 m

Length
35.00 m

Side height
6.00 m

Ridge height
8.68 m

Snow load
1.25 kN/m²

A temporary building as an interim solution: The customer rented the HALTEC "Aluflex.plus" temporary building for one year. The hall is an interim solution for warehousing the goods until the actual hall is completed.

The finished products are temporarily stored in the hall for protection before despatch. This means that the goods are no longer in the way and do not hinder production processes. The aluminium frame of the hall was erected directly next to the existing building. A lock connects the two structures, making it easier to get from one hall to the other. The protection class 3 temporary building is equipped with interior tarpaulins to protect the goods from dripping water.

Numerous equipment details are customised to meet individual customer requirements:

  • A large and wide sliding door on the side wall allows easy access to the hall.
  • Ground pegs as foundation-free anchoring realise short assembly times on almost any surface and can be removed almost residue-free.
  • The hall façade is fitted with a sturdy trapezoidal sheet metal and offers additional protection, also against theft.

Reference images and details

Temporary space gain

With the new temporary building from HALTEC, the customer was able to create temporary storage space.

Brightly illuminated

The translucent roof tarpaulins allow plenty of daylight into the hall and ensure a friendly hall atmosphere.

Simple hall entrance

Thanks to the wide sliding doors, the hall can also be accessed by large vehicles.

Efficient hall extension

Short distances: The temporary building is directly connected to the existing building. A lock made of tarpaulin material forms the transition.

Quick and easy anchoring

Ground pegs anchoring is ideal for temporary halls in particular. No foundations are required and dismantling is almost residue-free.

Attractive floor connection

The simple floor connection is cost-effective and gives the hall a clean look.