SELECT Reference 159
Production building with office for a Swiss company
Two large SELECT steel buildings next to each other form a hall complex of over 2,500 m². While one hall serves as a production building, the other hall is home to the office staff. It was particularly important to the entrepreneur that the project was carried out by an experienced hall constructor.
The two steel buildings impress with their great appearance. The large production building with a saddle roof, which is also the larger of the two, is grey in colour. The additional office extension was realised using a pent roof hall. A blue hall façade was chosen here for visual differentiation.
The HALTEC halls are not only a real eye-catcher visually - no, there is also a lot inside. Here you will encounter high-level technical expertise and fantastic interior fittings.
Production building
- Fully insulated hall with low energy costs
- Six indoor cranes (5 tonnes each) to support production work with heavy steel components
- 42 m insulated intermediate gutter with heating as an optimal hall transition from production building to office
- 7 m self-supporting canopy to protect stored goods in the outdoor area
Office hall
- Large canopy for a weather-protected entrance area
- Hall entrance via a double-leaf aluminium entrance door
- 12 windows with electric external venetian blinds to regulate the light conditions in the office
- Four skylight domes in the roof for more daylight inside the hall
- Long side of the hall fitted with mineral wool panels in accordance with fire protection regulations - Adjacent areas of both halls
- Fully insulated hall for optimum working conditions
Each hall functions perfectly for its requirements, which is exactly what characterises HALTEC's individual hall construction. Create added value with HALTEC SELECT steel buildings - space gain at the highest level!
Reference images and details
Lots of space gain
The offices and production area are optimally accommodated on an area of 2,520 m².
Convenient load transport
The integrated indoor cranes make moving heavy steel components much quicker and easier.
Lots of daylight
The integrated row of windows in ridge provides plenty of light in the hall and allows stale air to be extracted through controllable openings.
For extra high snow loads
Centre supports reinforce the steel scaffolding and allow for slimmer profiles despite high snow loads.
Storage area protected from the weather
A huge 7 metre canopy protects stored goods from the sun and rain, even outdoors.
Roofed hall entrance
The main entrance to the office was fitted with a canopy and a double-leaf door.
SELECT Reference 159