Multi-purpose building for the German Red Cross
The DRK was specifically looking for a hall that would fulfil the requirements for several purposes at once. With a steel hall, HALTEC was able to combine not only the vehicles, but also a workshop and a warehouse under one roof within a very short space of time.
HALTEC realised a SELECT steel building with an area of 1,650 m², which could be provided much faster than a comparable hall in solid construction thanks to the modular design.
The 25 emergency vehicles used for training can be stored dry and protected in the large hall. In addition, a workshop area for repairing vehicles and equipment as well as a warehouse could be accommodated.
The new building is now also home to the "rapid response unit" and a rescue dog squadron.
Reference images and details
Modern look
The anthracite-coloured hall with red contrasting box gutters is modern and appealing on the outside.
Economical and quickly available
The high degree of prefabrication and the modular design enable short construction times and a good price-performance ratio.
Fast entry and exit
Four large electric industrial sectional gates allow the emergency services to enter and exit quickly at any time.
Well advised. HALTEC.
Building a hall raises many questions. Our online guide has detailed answers for you.
Find out more about fire protection in hall construction under Authorisation and safety. Get to know the different types of foundations and their differences and find out what costs you can expect in hall construction. In the general hall construction section, we compare the construction methods of steel, concrete and wood for you and explain the advantages of hot-dip galvanised steel.