BASIC Reference 196

Storage tent for a water treatment company

Protection class 2 | uninsulated. A Franconian service company expanded its storage area with a HALTEC storage tent. The weather-protected and safe storage of goods was particularly important to the client. Above all, however, the company was impressed by the rapid availability of the hall.

Space gain
250 m²

Width
10.00 m

Length
25.00 m

Side height
3.50 m

Ridge height
4.84 m

Snow load
1.20 kN/m²

The company from Ebern, which is active in the field of water treatment, has recently started purchasing its work materials in sustainable paper packaging. The problem here is that the goods now need adequate protection to shield them from dirt and the weather. So what to do when additional storage space is needed in a short space of time? Simply ask HALTEC! The space gain expert was on the spot immediately and supported the client with a BASIC temporary building that was quickly available. The new tent hall was erected on the company premises in no time at all - thanks to the modular design and ground pegs anchoring.

Costs for foundations saved

The ground pegs anchoring was also a convincing feature of the hall construction. This anchoring method made it possible to assemble the hall on the existing asphalt floor without any problems. This meant that no additional foundation work was required in advance. This saved the company a lot of time and money. In addition, anchoring by ground pegs means that the storage tent can be dismantled at any time, as the ground pegs can be removed from the ground with virtually no residue.

Reference images and details

Protected warehouse

Moisture-sensitive goods are stored safely and dryly in the simple storage tent.

Bright hall interior

The translucent tarpaulin panelling enables protected storage of goods and energy-saving use of the hall.

Easy access to the hall

Access to the hall is via the tarpaulin gate in the gable wall - the large gate makes it easy to drive in and out with a forklift truck.

Uncomplicated hall fastening

Foundation-free anchoring using ground nails saves time during hall construction and is easy on the wallet at the same time.

Simple tent assembly

Thanks to the simple hall construction, the storage tent was assembled and ready for use within a day.

Well advised. HALTEC.

Building a hall raises many questions. Our online guide has detailed answers for you.

Find out how you can erect temporary buildings without foundations using soil nails. What you need to consider when obtaining approval for temporary buildings and which types of foundations are suitable if the temporary building is to be anchored with heavy-duty anchors. We also explain how temporary buildings can be moved on rails or attached without anchoring using ballast only.