SELECT Reference 033

Industrial hall with indoor cranes for a metalworking company

A metal fabricator from Baden-Württemberg built his new industrial hall with HALTEC. The special feature: two indoor cranes were installed on 531 m². This means that the client can handle heavy goods with ease now.

Space gain
531 m²

Width
21.50 m

Length
24.70 m

Side height
8.66 m

Ridge height
9.60 m

Snow load
0.87 kN/m²

The industrial hall was built extra high so that the two 12.5 tonne indoor cranes could be used efficiently. A row of windows in ridge with SHEV function closes off the building at a height of almost 10.0 metres. This not only guarantees fire protection, but also allows plenty of natural light into the hall. The daylight atmosphere inside the hall is additionally supported by the wall-strip windows on three sides of the hall.

An electrically controlled industrial sectional gate allows easy access to the hall. Thanks to the elevation, the space inside the hall is utilised as efficiently as possible.

Reference images and details

Large space gain

The metal fabricator's new SELECT steel building was built on 531 m². With a height of almost 10.0 metres, the hall looks extremely imposing.

Bright hall interior

The roof light strip and three wall-strip windows bring plenty of daylight into the hall interior and fulfil fire protection requirements at the same time.

High efficiency

Heavy goods can be moved effortlessly and precisely with the two indoor cranes.

Efficient space utilisation

The industrial sectional gate with height guidance means that no valuable space is lost inside the hall.