Functional warehouses for a drywall builder

Franz Obermeier Trockenbau urgently needed more space for its warehouse and office. In HALTEC, the company found an experienced partner for hall construction with a top price-performance ratio.

Space gain
360 m²

Width
15.00 m

Length
24.00 m

Side height
5.30 m

Ridge height
6.62 m

Snow load
3.58 kN/m²

When the dry construction company's previous headquarters became too small, a new hall was unavoidable. HALTEC delivered a hall construction that was perfectly tailored to the company's requirements. In addition to the large storage area, the hall includes an office wing with kitchen and sanitary facilities, which optimally supports the daily processes.

Sophisticated equipment for maximum benefit

The hall offers various equipment options that make operations more efficient. A canopy protects against the weather when delivering materials, while industrial sectional gates allow large vehicles to enter and exit. Numerous rows of windows, a row of windows in ridge and skylight domes provide natural light and a pleasant working environment.

Contact person on site

It was important for Franz Obermeier to have a contact person close by. With a total of 13 sales locations in Germany, HALTEC always has a local presence. This meant that Mr Obermeier could rely on the competent and personal advice of the HALTEC experts, in this case from the Munich location, throughout the planning and implementation phase.


With HALTEC, we had a reliable partner at our side right from the start. The new hall is perfectly tailored to our needs and enables us to work more efficiently. We were particularly impressed by the well thought-out equipment and the professional handling.

Franz Obermeier, Owner

Reference images and details

Attractive appearance

The hall, finished in RAL 9007 tone-on-tone, impresses with its modern look.

Efficient space gain

Franz Obermeier has enough space to store his materials and tools efficiently on 360 m².

Protected access road

The driveways are protected by a large canopy. This allows the gates to be opened even when it rains.

Longevity

The completely hot-dip galvanised steel construction guarantees the durability of the hall.

safety

Rooflight domes with SHEV function not only allow daylight into the hall, but also provide the necessary fire protection.

Well advised. HALTEC.

Building a hall raises many questions. Our online guide has detailed answers for you.

Find out more about fire protection in hall construction under Authorisation and safety. Get to know the different types of foundations and their differences and find out what costs you can expect in hall construction. In the general hall construction section, we compare the construction methods of steel, concrete and wood for you and explain the advantages of hot-dip galvanised steel.