154

Warehouse as prefabricated building: creating a lucrative logistics warehouse

Warehouse prefabricated building freight forwarding HALTEC warehouse building interior view Hall walkway warehouse loading hall Loading bay freight forwarding Hall access freight forwarding truck HALTEC loading hall exterior view Warehouse building façade

Are you looking for a warehouse as a prefabricated building? HALTEC supplies sturdy halls in excellent quality, within shortest time and at top price-performance ratio. Many satisfied customers report on their hall projects with HALTEC, as does this Lower Saxon freight forwarding company. Two thermally insulated prefabricated HALTEC BASIC halls were realized within a very short time. Find out more about the great construction project!

Large logistics warehouse with loading hall

A prompt hall construction for permanent use was particularly important to the customer in at the beginning. A space gain of 2,375 m² was created for the logistics company – enough space to store temporarily and to load all the goods.
The hall complex consists of two adjoining built HALTEC BASIC halls, where all work processes can take place under optimal conditions. With 1,750 m² the warehouse building represents the larger hall of both. Numerous goods are stored here and waiting for being forwarded. Pick-up shipments are stowed next door in the smaller loading hall, where the loading of the forwarding trucks takes place. The 625 m² loading hall has an eaves height of 7 m – ideal for easy loading of trailers by means of a loading crane from above. Also the large hall indoor area is very advantageous. A simple manoeuvring of trucks and trailers is possible without much effort.

Warehouse prefabricated building – protection class No. 5 fully insulated

  • dowel anchoring on base slabs created on-site for permanent use
  • sealing tape as a ground trim for more protection against moisture from the outside and for better insulation
  • roof and wall cladding made of 60 mm thick sandwich panels for insulation
  • robust hall construction for high snow loads
  • hall access via two doors and two electric roller shutter doors
  • integrated row of windows in façade for more daylight in the hall

Loading hall prefabricated building – protection class No. 4 partly thermally insulated

  • roof tarpaulins with retracted inner tarpaulin for efficient condensation protection
  • translucent roof tarpaulins for more daylight inside the hall
  • wall cladding with 60 mm thick sandwich panels for insulation
  • hall access through a door and two electric roller shutter doors
  • floor seal by means of sealing tape for better hall sealing
  • dowel anchorage for permanent use

The hall combination was realized with special consideration of the load case "North German Plain". Perfectly adapted, the statics of the HALTEC halls also withstand special conditions! With HALTEC as a partner, the freight forwarding company plays it safe.

The equipment of the hall combination in detail:

Warehouse building interior view

HALTEC warehouse building interior view

Row of windows in façade | Wall cladding with integrated row of windows in façade for more daylight in the hall and additional energy cost savings.

Hall walkway warehouse loading hall

Hall walkway warehouse loading hall

Electrical roller shutter door | Two opposing roller shutter doors allow direct passage from the warehouse to the smaller loading hall.

Loading hall interior view

Loading bay freight forwarding

Tarpaulin covered roof | Retracted interior tarpaulins ensure a secure condensation protection. In addition, the translucent roof tarpaulin allows daylight-like lighting conditions in the hall.

Hall access trucks

Hall access freight forwarding truck

Loading hall with large access | Thanks to large doors, trucks can drive directly into the hall and be weather-protected.

Loading zone with crash barrier

HALTEC loading hall exterior view

Efective hall protection | At all entrance doors and at the entrance of the loading hall, crash protection pollers were installed on-site to protect the halls.

Hall roof with rain gutter

Warehouse building façade

Controlled water drainage | The integrated box gutter drains the rainwater in a controlled manner. The connection to the sewage system was made on-site.