Warehouse building
For this riding club, HALTEC realised a customised, permanent solution for storing feed. Function-specific details such as impact protection offer the perfect enhancement to this hall.
The roof is extended by 5.60 m, offering additional space gain for sheltered storage.
Wooden beams between the supports protect the hall wall against damage.
A ridge rooflight provides pleasant light conditions on the inside.
Roof overhang.
Fleece coating in the roof to prevent condensation.
Two-leaf trapezoidal sliding gate.
Extremely stable, hot-dip galvanized steel construction.
Dowel anchoring on ground plate.
Ground connection with a small base.
