A temporary building as an interim solution

Temporary buildings for hire Interim storage in a temporary building Hall façade with sliding gate Hall construction with lock Building anchorage without groundwork Floor connection for HALTEC hall

A temporary building for short-term storage: a sheet metal forming company is using this temporary building as an interim solution until the construction of its new building is complete.
The customer has rented the HALTEX "aluflex.plus" temporary building for one year. The finished products are protected and stored in the hall prior to dispatch. This means the goods are no longer an obstacle and do not impede any production processes. The aluminium frame of the hall has been erected right next to the existing buildings, connected by a lock. The building complies with protection class 3 and is fitted with interior tarpaulins to protect the goods from dripping water.

Interim storage in a temporary building

Transparent roof tarpaulins let plenty of natural light into the building.

Hall façade with sliding gate

The wide sliding gates mean that the hall can also be accessed by large vehicles.

Hall construction with lock

Short distances: the temporary building is directly connected to the existing buildings. A lock made of tarpaulin material forms the passageway.

Building anchorage without groundwork

Ground peg anchorage is especially ideal for temporary buildings, thanks to the elimination of groundwork and residue-free removal.

Floor connection for HALTEC hall

Simple, cost-effective floor connection.