Prefabricated hall for stormy coastal region

Prefabricated hall Poland as storage for foils Tarpaulin roof foil storage Profile filler strips hall façade Hall floor connection bitumen membrane Roof bracing with rain gutter Peg anchoring prefabricated hall Electrical rolling gate hall façade

Structural safe halls are a must on the windy Baltic Sea coast! This was also the thought of the Stolko company from Słupsk – the film manufacturer from Poland decided for a robust prefabricated hall from HALTEC to expand its warehouse capacities. The reliable quality hall from German production fully meets the requirements of the Polish company.

Prefabricated hall in Poland for efficient warehouse expansion

The successful family company Stolko is one of the leading film manufacturers in Pomerania and is making great strides. For successful company growth, even more storage space was required, which HALTEC has implemented perfectly with a BASIC hall of protection class No. 3 – protected against condensation. The 344 m² prefabricated hall in Poland is ideally suited as a weather-protected storage facility for the finished film rolls.

TÜV-certified HALTEC hall – a safe investment for the future

Stolko is enthusiastic about the new HALTEC BASIC hall and is happy to have made a good investment. The prefabricated hall in Poland scores in many ways and is perfectly tailored to the needs of the company. The robust screwed hall construction in a 2.50 m grid easily withstands the sometimes stormy Baltic winds. In addition, the prefabricated hall is fixed to the ground using pegs. With this anchoring method, the hall could be installed directly on the existing paving surface without any foundations – this not only saved time, but also construction costs.
Should the company continue to grow, there is also the option of gradually adapting the prefabricated hall – the system halls from HALTEC can be flexibly expanded. With the 20-year availability guarantee from HALTEC, the client is on the safe side! The procurement of spare parts for repairs or an expansion of the hall is not a challenge.

Looking back, I can say that with HALTEC we have found the best possible partner on the market.

Jacek Kończal
Co-owner | P.P.H.U. Stolko S.C.

Jacek Kończal | P.P.H.U. Stolko S.C.

The equipment of the prefabricated hall in Poland in detail:

Tarpaulin roof

Tarpaulin roof foil storage

Translucent roof tarpaulins | The roof construction ensures a bright interior and at the same time realizes optimal protection against condensation from above with additionally retracted interior tarpaulin.

Hall façade

Profile filler strips hall façade

Trapezoidal profile covering | The robust hall façade made of trapezoidal profile offers effective protection and creates a nice hall character. Inserted profile filler strips additionally close the façade, thus reducing the penetration of dust and dirt into the hall.

Hall floor connection

Hall floor connection bitumen membrane

Floor connection | The bitumen membrane on the floor protects the hall from the penetration of dirt and vermin and at the same time keeps surface water away.

Roof bracing with rain gutter

Roof bracing with rain gutter

Controlled water drainage | Rainwater runs off in a controlled manner from the hall roof via the additionally installed box gutter.

Anchoring without foundation

Peg anchoring prefabricated hall

Peg anchoring | Thanks to the foundation-free anchoring using pegs, low construction costs and a faster assembly time could be realized.

Hall accesses

Electrical rolling gate hall façade

Roller door with the adjacent door | The electrical industrial gate can be operated very simply at a push of a button. The escape door opposite serves as an additional entrance.

Stolko also produces films for the food-related sector – with the BRC certificate; for this production, the company is excellently qualified. The professional storage of the foils had a decisive influence on the new hall construction. The international requirements of the BRC Global Standard Packaging had to be met – hygiene takes top priority. Provided with additional equipment – such as profile filler strips in a trapezoidal profile, a bitumen membrane as a floor finish and much more – the prefabricated hall in Poland is ideally suited for film storage.

HALTEC, as an experienced expert in gaining space, is the perfect partner when it comes to hall construction, even in case of demanding buildings. Our local contacts will be happy to advise you on your construction project – request your personal offer here!