Purchase warehouse building: company expansion for more space gain
An expansion is a bold step for an entrepreneur – everything wants to be well thought-out. It is therefore all the more important to know good partners at the side to which you can rely on. The medium-sized company Stefan Hirsch GmbH & Co. KG from the Upper Palatinate (Oberpfalz) is already an enthusiastic HALTEC customer with its two existing halls and relies on the experience of the hall builder also in the new construction project. The third warehouse completes the trio. In company colours, matching the existing office and workshop buildings, the HALTEC BASIC warehouse buildings deliver a harmonic picture. The halls were especially convincing with their great price-performance ratio. Purchase warehouse building – preferably at HALTEC, your expert for space gain!
Purchase warehouse buildings for maximum space gain
At the headquarters of the new head office, a completely new logistics division was to be created in order to expand for the future the already successfully ongoing offer. The idea behind it: store goods from commercial customers for a reasonable rental price. For this, enough storage space had to be created, which also offers effective weather protection. HALTEC was able to meet optimally the demand with its BASIC steel halls. “The company HALTEC helped us master the challenges of the new company building.", says Stefan Hirsch, Managing Director of Stefan Hirsch GmbH & Co. KG.
Purchase warehouse buildings – with HALTEC it's as simple as that: High cost and time savings, more than 3,660 m² space gain and the installation on the existing surface were the decisive advantages for the client.
High quality saddle roof halls in system construction
Thanks to their high quality standards, HALTEC's BASIC warehouse buildings can withstand a great deal of work – precisely calculated by in-house design offices, ensuring the necessary safety for people and goods. The hot-dip galvanized steel construction guarantees a stable and long service life. The system halls are real German engineering work that you can see and feel:
- roof trapezoidal profiles with anti-condensation fleece coating for protection of goods from dripping water from above
- trapezoidal profile cladding for an appealing hall optics
- rows of windows in the façade for daylight inside the hall and additional energy savings
- electric roller doors plus adjoining entrance doors for the movement of persons and goods
- perforated sheet metal strips in the side walls of the hall for ventilation and smoke extraction in case of fire
Purchase warehouse building without foundation works
The hall assembly was carried out cost-saving directly on the existing asphalt surface by means of anchoring with pegs. Thus, it was possible in advance to abstain from costly foundation work. Even the option for residue-free hall dismantling convinced – so the sustainable halls can be dismantled if necessary and assembled elsewhere. Purchase HALTEC warehouse building – with peg anchorage quickly and cost-effectively in the assembly!
We were surprised by the fast construction, the assembly without heavy equipment and the anchoring with the pegs.
Karl-Heinz Kiener
Operations Manager | Stefan Hirsch GmbH & Co. KG
IT WAS PARTICULARLY IMPORTANT TO THE CUSTOMER WHEN PURCHASING THE WAREHOUSE BUILDING:
THE RIGHT USAGE
weather-protected warehouse
Roof covering with condensation protection and perforated metal strips for an optimal room climate.
IN THE RIGHT QUALITY
solid steel halls
HALTEC BASIC steel halls in system construction meet all requirements of the client.
IN THE RIGHT PLACE
assembly on existing asphalt surface
Time and cost savings thanks to foundation-free peg anchoring.
The equipment of the warehouse buildings in detail:
Hall roof
Trapezoidal profile with anti-condensation fleece coating | Effective goods protection against dripping condensation water from the roof of the building.
Hall ventilation
Perforated steel sheet | The stripes ensure good air circulation and smoke extraction in case of fire.
Illumintaion steel hall
Rows of windows in façade | Integrated rows of windows in façade let a lot of daylight into the hall and provide energy saving that pays off.
Hall entrances
Rolling gate with adjoining door | Electric roller gate with adjoining entrance door serves for safe personal and goods transport.
Hall fixing
Foundation-free hall assembly | Construction costs saved by mounting with peg anchoring directly on the asphalt surface.
Hall floor connection
Floor connection | As an optically clean hall transition to the floor serves an L-angle with additional sealing tape.
