Worldwide
New

Our popular marquees and large marquees now have a new name:
Haltent by HALTEC.

www.haltent.net

Reference
For statics and safety

HALTEC REFERENCES

156

Hall with crane track: a perfect combination of workshop and warehouse

HALTEC SELECT steel hall  exterior view Hall with crane track workshop HALTEC SELECT hall warehouse area Hall interior with gable partition HALTEC SELECT hall roof with curved row of windows in ridge Hall exterior view with canopies Sectional gate with window sections HALTEC temporary building in Wolfenbüttel

For satisfied employees and work processes optimally matching, you need a suitable work environment with functional tools. Those who invest clever, can also achieve a lot! A customer from the logistics industry has had a individually planned SELECT steel hall built by HALTEC at its new company location in Lower Saxony. The hall with crane track efficiently unites workshop and warehouse, thereby contributing to the optimization of work processes.

HALTEC SELECT crane hall for efficient workshop operation

During the construction of the new hall, the logistics vehicle dealer decided in favor of HALTEC, the experts for space saving. An individually designed hall construction should be the new hall construction, which perfectly combines workshop and warehouse under one roof. For HALTEC, only a SELECT steel hall came into consideration, which can optimally implement all the wishes of the customer:

  • 1,500 m² steel hall in individual design for permanent use
  • Thermal insulation with 100 mm sandwich panels for low heating costs
  • 38 m row of windows in ridge for plenty of light in the hall with hatches for air extraction - additionally equipped with smoke and heat exhaust system for compliance with fire
  • 10 t hall crane for easy moving of heavy loads
  • insulated gable partition with sectional gate to separate the workshop from the warehouse and save energy costs
  • Protected hall exterior areas by a large canopy and an additional pent roof

New crane hall creates optimal interaction between workshop and warehouse

Especially important for the construction of the new HALTEC SELECT steel hall was the installation of a crane track for the workshop. Forklift trucks in need of repair as well as other vehicles are serviced and repaired here. The elaborate work on the weighty vehicles is heavy work - here a double-stranded crane track should provide support. The project was accomplished with a 25 m long crane track in the workshop hall area. Lifting heavy loads is now no longer a challenge, but now works just by pressing a button on the hall crane.

Housed in the new steel hall is as well a warehouse, in which are stored mainly new vehicles for sale. They remain here only until they are picked up or delivered. The storage section in the area of the workshop is delimited by a gable partition. The movement of persons and goods between the areas takes place exclusively via a large sectional gate plus a small adjoining door. If a defective forklift truck is now completely repaired and ready for pickup, it can be stored in the warehouse to save space next door from the workshop.

The equipment of the new hall with crane track in detail:

Workshop with 10 t hall crane

Hall with crane track workshop

Hall crane | Easier work with the crane support - at the touch of a button, heavy loads can be lifted and set down precisely.

Storage area for new vehicles

HALTEC SELECT hall warehouse area

Protected warehouse | Safe from theft and weather conditions, the new vehicles are stored here until they are picked up or delivered.

Gable partition for hall division

Hall interior with gable partition

Gable partition | It gives structure to the hall by spatially separating the warehouse from the workshop. The areas are only connected via a sectional gate with adjoining door.

Energy saving curved row of windows in ridge

HALTEC SELECT hall roof with curved row of windows in ridge

Curved row of windows in ridge | The 38-meter long curved row of windows on the roof of the hall provides daylight in the hall and integrated hatches allow the withdrawal of used air.

Hall outside area with carport

Hall exterior view with canopies

Steel hall with canopies | To protect the vehicles parked outside the hall, a large canopy and a pent roof were added.

Individual hall planning

Sectional gate with window sections

Hall equipment | In total, seven electric sectional gates and seven doors were installed in the hall. There are also 11 windows in the hall façade.

Second construction project HALTEC temporary building

HALTEC temporary building in Wolfenbüttel

Hall in modular construction | Find out more about the second HALTEC hall at GS-Gabelstapler - economical hall as a modular construction.